Provide a minimum roof r value of r 24 or greater.
General drawing set notes for green roof.
Location shown coordinate with mep drawings.
Door tag keynote tag sheet note tag demolition note tag revision tag window type tag wall type tag ceiling height.
Numbers in the parenthesis refer to sections of the 2017 edition of the county of los angeles green building standards code table t.
Iii description of revision this revision which supersedes the goddard space flight center gsfc standard x 673 64 1e engineering drawing standards manual is intended to update and reflect the latest formats and standards adopted by gsfc.
The gc shall abide by and be responsible for all requirements stated in the aia document a201 general conditions current issue unless noted otherwise.
Green roof energy and environment.
General notes interior elevation tag exterior elevation tag building section flag wall section flag detail flag detail callout north arrow grid bubble grid line a 1 room name 101 0 a101 1 sim a 101 a101 1 0 1 sim 0 0 a f f.
Aug 22 2017 this pin was discovered by luis herrera.
General notes general project information plan check no.
R9 patch existing roof deck roof insulation and roofing as required by removal of existing condensing unit associated curbs controls and piping in phase 2b.
See roof plan general notes.
District no job address city zip note.
Discover and save your own pins on pinterest.
Provide tapered insulation as required to maintain a 1 4.
The replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety.
Or the credit gives the option of combining high solar reflective index sri roofing material and green roof.
See structural drawings for top of steel t o s at all proposed roofs.
Heat island effect roof 1 point green roofs reduce building heat absorption.
The gc shall provide all labor material equipment tools utilities insurance transportation and pay.
Instructions the following notes must be included on the plans.
In order to earn this credit the green roof must cover at least 50 of the roof area.
The roof is to perform under category 5.
General notes roof plan 1.